Opens in a new tab
◎ English

Pharmaceutical Tablet Dedusters

NINGRUI supplies tablet dedusting equipment for the discharge stage after compression. The task is to remove loose surface powder while moving tablets toward the next handling step.

Combine Surface Powder Removal and Transfer

Tablet Movement and Powder Separation

Dedusting uses controlled tablet movement and a path that allows loose powder to separate. Define the tablet dimensions, shape, and mechanical strength when assessing transport conditions and the required processing rate.

Extraction and Discharge Alignment

Separated powder needs a suitable extraction connection. Review the press outlet, deduster inlet and outlet heights, receiving equipment, and available extraction duty together. Cleaning access matters where products or tablet formats change.

Technical Specification Basis

ItemSelection Requirement
TabletsDimensions, shape, weight, and susceptibility to damage
FlowRequired rate and tablet conditions at the press discharge
TransferInlet/outlet heights, footprint, and receiving connection
ExtractionAvailable suction, collection arrangement, and connection
ChangeoverContact parts, cleaning access, and format requirements

The selected unit's rated output and transfer arrangement are confirmed for the intended tablets and installation.

Applications After Tablet Compression

Dedusting prepares compressed tablets for subsequent handling where loose powder needs to be removed. Powder removal and tablet integrity should be assessed together using the intended product. Metal detection requires its own equipment and verification.

Plan the Post-Compression Sequence

See tablet press machines for the upstream process and pharmaceutical metal detectors for the separate contamination-detection task.

Discuss a Tablet Deduster

Provide tablet dimensions, the press output, discharge height, and available extraction information. Identify the equipment receiving the tablets after dedusting.

Send a Tablet Deduster Inquiry

Include the equipment or process, required capacity, and project location. For support, include the model and serial number if available.
Fields marked * are required.

Submit your equipment or project requirements for review.